<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Journal Publishing DTD v1.3 20210610//EN" "JATS-journalpublishing1-3.dtd">
<article article-type="research-article" dtd-version="1.3" xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xml:lang="ru"><front><journal-meta><journal-id journal-id-type="publisher-id">mgssuvest</journal-id><journal-title-group><journal-title xml:lang="ru">Вестник МГСУ</journal-title><trans-title-group xml:lang="en"><trans-title>Vestnik MGSU</trans-title></trans-title-group></journal-title-group><issn pub-type="ppub">1997-0935</issn><issn pub-type="epub">2304-6600</issn><publisher><publisher-name>Moscow State University of Civil Engineering (National Research University) (MGSU)</publisher-name></publisher></journal-meta><article-meta><article-id pub-id-type="doi">10.22227/1997-0935.2026.2.269-279</article-id><article-id custom-type="elpub" pub-id-type="custom">mgssuvest-895</article-id><article-categories><subj-group subj-group-type="heading"><subject>Research Article</subject></subj-group><subj-group subj-group-type="section-heading" xml:lang="ru"><subject>Технология и организация строительства. Экономика и управление в строительстве</subject></subj-group><subj-group subj-group-type="section-heading" xml:lang="en"><subject>Technology and organization of construction. Economics and management in construction</subject></subj-group></article-categories><title-group><article-title>Оптимизация функций технического заказчика при вводе объектов в эксплуатацию средствами моделирования бизнес-процессов</article-title><trans-title-group xml:lang="en"><trans-title>Optimization of technical customer functions when commissioning facilities using business process modelling tools</trans-title></trans-title-group></title-group><contrib-group><contrib contrib-type="author" corresp="yes"><name-alternatives><name name-style="eastern" xml:lang="ru"><surname>Топчий</surname><given-names>Д. В.</given-names></name><name name-style="western" xml:lang="en"><surname>Topchiy</surname><given-names>D. V.</given-names></name></name-alternatives><bio xml:lang="ru"><p>Дмитрий Владимирович Топчий — доктор технических наук, доцент, заведующий кафедрой испытаний сооружений</p><p>129337, г. Москва, Ярославское шоссе, д. 26</p></bio><bio xml:lang="en"><p>Dmitry V. Topchiy — Doctor of Technical Sciences, Associate Professor, Head of the Department of Structure Testing</p><p>26 Yaroslavskoe shosse, Moscow, 129337</p></bio><email xlink:type="simple">TopchiyDV@mgsu.ru</email><xref ref-type="aff" rid="aff-1"/></contrib><contrib contrib-type="author" corresp="yes"><name-alternatives><name name-style="eastern" xml:lang="ru"><surname>Лавреняк</surname><given-names>И. В.</given-names></name><name name-style="western" xml:lang="en"><surname>Lavreniak</surname><given-names>I. V.</given-names></name></name-alternatives><bio xml:lang="ru"><p>Илья Вячеславович Лавреняк — аспирант кафедры испытаний сооружений</p><p>129337, г. Москва, Ярославское шоссе, д. 26</p></bio><bio xml:lang="en"><p>Ilya V. Lavreniak — postgraduate student of the Department of Structure Testing</p><p>26 Yaroslavskoe shosse, Moscow, 129337</p></bio><email xlink:type="simple">89636736614@mail.ru</email><xref ref-type="aff" rid="aff-1"/></contrib></contrib-group><aff-alternatives id="aff-1"><aff xml:lang="ru"><institution>Национальный исследовательский Московский государственный строительный университет (НИУ МГСУ)</institution><country>Россия</country></aff><aff xml:lang="en"><institution>Moscow State University of Civil Engineering (National Research University) (MGSU)</institution><country>Russian Federation</country></aff></aff-alternatives><pub-date pub-type="collection"><year>2026</year></pub-date><pub-date pub-type="epub"><day>26</day><month>02</month><year>2026</year></pub-date><volume>21</volume><issue>2</issue><fpage>269</fpage><lpage>279</lpage><permissions><copyright-statement>Copyright &amp;#x00A9; Топчий Д.В., Лавреняк И.В., 2026</copyright-statement><copyright-year>2026</copyright-year><copyright-holder xml:lang="ru">Топчий Д.В., Лавреняк И.В.</copyright-holder><copyright-holder xml:lang="en">Topchiy D.V., Lavreniak I.V.</copyright-holder><license xml:lang="ru" license-type="creative-commons-attribution" xlink:href="https://creativecommons.org/licenses/by/4.0/" xlink:type="simple"><license-p>Данная работа распространяется под лицензией Creative Commons Attribution 4.0.</license-p></license><license xml:lang="en" license-type="creative-commons-attribution" xlink:href="https://creativecommons.org/licenses/by/4.0/" xlink:type="simple"><license-p>This work is licensed under a Creative Commons Attribution 4.0 License.</license-p></license></permissions><self-uri xlink:href="https://www.vestnikmgsu.ru/jour/article/view/895">https://www.vestnikmgsu.ru/jour/article/view/895</self-uri><abstract><sec><title>Введение</title><p>Введение. Актуальность исследования обусловлена необходимостью повышения эффективности технического заказчика на этапе ввода строительного объекта в эксплуатацию. Предыдущее исследование продемонстрировало возможность применения параметрической нейросетевой модели оценки эффективности, однако остается нерешенной проблема детальной регламентации управленческих процессов и четкого определения функций технического заказчика на различных этапах жизненного цикла. Современные строительные проекты требуют координации множества участников в условиях жестких временных и бюджетных ограничений, что предъявляет высокие требования к качеству управленческих решений, принимаемых техническим заказчиком при подготовке и введении объектов в эксплуатацию. Методология бизнес-анализа и процессного моделирования позволяет преодолеть эту проблему через систематизацию и оптимизацию управленческих процессов, выявление «узких» мест и дублирование функций, обеспечивая своевременное введение объекта в эксплуатацию. В то время как существуют разработки, направленные на структурирование отдельных этапов строительного производства, менее освещенным остается вопрос комплексного описания и оптимизации всего цикла управленческих решений технического заказчика с применением современного инструментария цифровой трансформации.</p></sec><sec><title>Материалы и методы</title><p>Материалы и методы. Использованы системный анализ, сравнительный анализ, синтез, параметрическое моделирование, метод аналогии.</p></sec><sec><title>Результаты</title><p>Результаты. Разработана детализированная BPMN-модель процесса (Business Process Model and Notation — стандартизированный графический язык для моделирования бизнес-процессов) принятия управленческих решений с идентификацией ролей участников, точек принятия решений и обратных связей для цикличной корректировки показателей. Предложены механизмы интеграции процессной модели с параметрической нейросетевой моделью и возможность подключения BIM-данных для автоматизации.</p></sec><sec><title>Выводы</title><p>Выводы. Применение методов реинжиниринга BPMN 2.0 систематизирует деятельность технического заказчика, обес-печивает прозрачность процессов, четкое распределение ответственности и возможность регулярной оптимизации через внедрение корректирующих организационных предложений. Использование моделей управления в качестве основы для разработки информационных систем способствует устранению пробелов между процессным проектированием и практической реализацией. Интеграция BPMN-моделей с искусственными нейронными сетями и BIM-системами открывает перспективы полной автоматизации процессов контроля и регламентации в строительстве.</p></sec></abstract><trans-abstract xml:lang="en"><sec><title>Introduction</title><p>Introduction. The relevance of the study is due to the need to improve the efficiency of the technical customer at the stage of commissioning a construction project. The previous research demonstrated the possibility of using a parametric neural network model to assess efficiency, but the problem of detailed regulation of management processes and a clear definition of the functions of the technical customer at various stages of the life cycle (LC) remains unresolved. Modern construction projects require the coordination of multiple participants under strict time and budget constraints, placing high demands on the quality of management decisions made by the technical customer during the preparation and commissioning of the project. Business analysis and process modelling methodologies help overcome this problem by systematizing and optimizing management processes, identifying bottlenecks and duplication of functions, and ensuring the timely commissioning of the project. While there are developments aimed at structuring individual stages of construction production, less attention is paid to the comprehensive description and optimization of the entire cycle of technical customer management decisions using modern digital transformation tools.</p></sec><sec><title>Materials and methods</title><p>Materials and methods. System analysis, comparative analysis, synthesis, parametric modelling, and the analogy method were used.</p></sec><sec><title>Results</title><p>Results. A detailed BPMN model of the management decision-making process was developed, identifying participant roles, decision points, and feedback loops for cyclical performance adjustments. Mechanisms for integrating the process model with a parametric neural network model and the ability to connect BIM data for automation were proposed.</p></sec><sec><title>Conclusions</title><p>Conclusions. The use of BPMN 2.0 reengineering methods systematizes the technical client’s activities, ensures process transparency, clear assignment of responsibilities, and the ability to regularly optimize through the implementation of corrective organizational proposals. Using management models as a basis for developing information systems helps bridge the gaps between process design and practical implementation. The integration of BPMN models with artificial neural networks and BIM systems opens up the prospect of fully automating control and regulatory processes in construction.</p></sec></trans-abstract><kwd-group xml:lang="ru"><kwd>технический заказчик</kwd><kwd>ввод объекта в эксплуатацию</kwd><kwd>жизненный цикл</kwd><kwd>параметрическая модель</kwd><kwd>бизнес-процессы строительства</kwd><kwd>процессный подход</kwd><kwd>нотация BPMN 2.0</kwd></kwd-group><kwd-group xml:lang="en"><kwd>technical customer</kwd><kwd>facility commissioning</kwd><kwd>life cycle</kwd><kwd>parametric model</kwd><kwd>construction business processes</kwd><kwd>process approach</kwd><kwd>BPMN 2.0 notation</kwd></kwd-group></article-meta></front><back><ref-list><title>References</title><ref id="cit1"><label>1</label><citation-alternatives><mixed-citation xml:lang="ru">Репин В.В. Моделирование бизнес-процессов в нотации BPMN. Часть II. Практикум в BPMS Bizagi Digital Platform. Литрес, 2021. 155 с.</mixed-citation><mixed-citation xml:lang="en">Repin V.V. Modeling Business Processes in BPMN Notation. Part II. Practicum in BPMS Bizagi Digital Platform. Litres, 2021; 155. (rus.).</mixed-citation></citation-alternatives></ref><ref id="cit2"><label>2</label><citation-alternatives><mixed-citation xml:lang="ru">Лучков В. Бизнес-процессы. Как это работает. Сила линейных алгоритмов. М. : Филинъ, 2019. 239 с.</mixed-citation><mixed-citation xml:lang="en">Luchkov V. Business Processes. How It Works. The Power of Linear Algorithms. Moscow, Filin, 2019; 240. (rus.).</mixed-citation></citation-alternatives></ref><ref id="cit3"><label>3</label><citation-alternatives><mixed-citation xml:lang="ru">Silver B. BPMN method and style. Aptos : Cody-Cassidy Press, 2011. 269 p.</mixed-citation><mixed-citation xml:lang="en">Silver B. BPMN method and style. Aptos, Cody-Cassidy Press, 2011; 269.</mixed-citation></citation-alternatives></ref><ref id="cit4"><label>4</label><citation-alternatives><mixed-citation xml:lang="ru">Кузьмина Т.К., Большакова П.В., Зуева Д.Д. Моделирование во времени процедур на этапе подготовки объекта к строительству. Построение базовой организационно-управленческой модели // Инженерный вестник Дона. 2021. № 5 (77). С. 414–423. EDN UMURSY.</mixed-citation><mixed-citation xml:lang="en">Kuzmina T.K., Bolshakova P.V., Zueva D.D. Time simulation of procedures at the stage of preparing an object for construction. Building a basic organizational and management model. Engineering journal of Don. 2021; 5(77):414-423. EDN UMURSY. (rus.).</mixed-citation></citation-alternatives></ref><ref id="cit5"><label>5</label><citation-alternatives><mixed-citation xml:lang="ru">Кузьмина Т.К., Бабушкина Д.Д., Тихомирова В.Ю., Валяев А.И., Сухоруков А.Е. Моделирование в BPMN и расчет продолжительности подготовительных процедур для проведения капитального ремонта МКД // Строительное производство. 2024. № 4. С. 119–125. DOI: 10.54950/26585340_2024_4_119. EDN TBUEOO.</mixed-citation><mixed-citation xml:lang="en">Kuzmina T.K., Babushkina D.D., Tikhomirova V.Yu., Valyaev A.I., Sukhorukov A.E. Modeling in BPMN and calculation of the duration of preparatory procedures for capital repairs of apartment buildings. Construction Production. 2024; 4:119-125. DOI: 10.54950/26585340_2024_4_119. EDN TBUEOO. (rus.).</mixed-citation></citation-alternatives></ref><ref id="cit6"><label>6</label><citation-alternatives><mixed-citation xml:lang="ru">Tsay G.S., Staub-French S., Poirier É. BIM for facilities management: an investigation into the asset information delivery process and the associated challen-ges // Applied Sciences. 2022. Vol. 12. Issue 19. P. 9542. DOI: 10.3390/app12199542</mixed-citation><mixed-citation xml:lang="en">Tsay G.S., Staub-French S., Poirier É. BIM for facilities management: an investigation into the asset information delivery process and the associated challenges. Applied Sciences. 2022; 12(19):9542. DOI: 10.3390/app12199542</mixed-citation></citation-alternatives></ref><ref id="cit7"><label>7</label><citation-alternatives><mixed-citation xml:lang="ru">Syed R.A.B., Agliata R., Mecca I., Mollo L. Semantic Web Technologies in Construction Facility Management: A Bibliometric Analysis and Future Directions // Buildings. 2025. Vol. 15. Issue 21. P. 3845. DOI: 10.3390/buildings15213845</mixed-citation><mixed-citation xml:lang="en">Syed R.A.B., Agliata R., Mecca I., Mollo L. Semantic Web Technologies in Construction Facility Management: A Bibliometric Analysis and Future Directions. Buildings. 2025; 15(21):3845. DOI: 10.3390/buildings15213845</mixed-citation></citation-alternatives></ref><ref id="cit8"><label>8</label><citation-alternatives><mixed-citation xml:lang="ru">Abanda F.H., Balu B., Adukpo S.E., Akintola A. Decoding ISO 19650 Through Process Modelling for Information Management and Stakeholder Communication in BIM // Buildings. 2025. Vol. 15. Issue 3. P. 431. DOI: 10.3390/buildings15030431</mixed-citation><mixed-citation xml:lang="en">Abanda F.H., Balu B., Adukpo S.E., Akintola A. Decoding ISO 19650 Through Process Modelling for Information Management and Stakeholder Communication in BIM. Buildings. 2025; 15(3):431. DOI: 10.3390/buildings15030431</mixed-citation></citation-alternatives></ref><ref id="cit9"><label>9</label><citation-alternatives><mixed-citation xml:lang="ru">Teixeira A.R., Ferreira J.V., Ramos A.L. Optimization of Business Processes Through BPM Methodology: A Case Study on Data Analysis and Performance Improvement // Information. 2024. Vol. 15. Issue 11. P. 724. DOI: 10.3390/info15110724</mixed-citation><mixed-citation xml:lang="en">Teixeira A.R., Ferreira J.V., Ramos A.L. Optimization of Business Processes Through BPM Methodology: A Case Study on Data Analysis and Performance Improvement. Information. 2024; 15(11):724. DOI: 10.3390/info15110724</mixed-citation></citation-alternatives></ref><ref id="cit10"><label>10</label><citation-alternatives><mixed-citation xml:lang="ru">Heidenwolf O., Antal K., Szabó I. Applying BPMN and Ontology to Measure Digital Maturity in Construction 4.0 — A Case Study // Proceedings of the Annual Hawaii International Conference on System Sciences. 2025. DOI: 10.24251/hicss.2025.707</mixed-citation><mixed-citation xml:lang="en">Heidenwolf O., Antal K., Szabó I. Applying BPMN and Ontology to Measure Digital Maturity in Construction 4.0 — A Case Study. Proceedings of the Annual Hawaii International Conference on System Sciences. 2025. DOI: 10.24251/hicss.2025.707</mixed-citation></citation-alternatives></ref><ref id="cit11"><label>11</label><citation-alternatives><mixed-citation xml:lang="ru">Разилов Р.Р. Анализ и оптимизация бизнес-процессов в строительной компании, специализирующейся на проектировании и обустройстве зимних садов // Вестник Московской международной академии. 2022. № 2. С. 170–174. EDN GBUQXI.</mixed-citation><mixed-citation xml:lang="en">Razilov R.R. Analysis and optimization of bu-siness processes in a construction company specializing in design and arrangement of winter gardens. Bulletin of the Moscow International Academy. 2022; 2:170-174. EDN GBUQXI. (rus.).</mixed-citation></citation-alternatives></ref><ref id="cit12"><label>12</label><citation-alternatives><mixed-citation xml:lang="ru">Fauth J., Bloch T., Soibelman L. PACE–BP: Process Analysis and Comparative Evaluation of Building Permit Processes in a Global Perspective // Journal of Management in Engineering. 2024. Vol. 40. Issue 5. DOI: 10.1061/jmenea.meeng-5958</mixed-citation><mixed-citation xml:lang="en">Fauth J., Bloch T., Soibelman L. PACE–BP: Process Analysis and Comparative Evaluation of Building Permit Processes in a Global Perspective. Journal of Management in Engineering. 2024; 40(5). DOI: 10.1061/jmenea.meeng-5958</mixed-citation></citation-alternatives></ref><ref id="cit13"><label>13</label><citation-alternatives><mixed-citation xml:lang="ru">Noardo F., Ellul C., Harrie L., Overland I., Shariat M., Ohori K.A. et al. Opportunities and challenges for GeoBIM in Europe: developing a building permits use-case to raise awareness and examine technical interoperability challenges // Journal of Spatial Science. 2019. Vol. 65. Issue 2. Pp. 209–233. DOI: 10.1080/14498596.2019.1627253</mixed-citation><mixed-citation xml:lang="en">Noardo F., Ellul C., Harrie L., Overland I., Shariat M., Ohori K.A. et al. Opportunities and challenges for GeoBIM in Europe: developing a building permits use-case to raise awareness and examine technical interoperability challenges. Journal of Spatial Science. 2019; 65(2):209-233. DOI: 10.1080/14498596.2019.1627253</mixed-citation></citation-alternatives></ref><ref id="cit14"><label>14</label><citation-alternatives><mixed-citation xml:lang="ru">Высочина М.В., Фокина Н.А. Использование процессного подхода в инвестиционно-строительной деятельности // Научный вестник: финансы, банки, инвестиции. 2024. № 3 (68). С. 215–230. DOI: 10.29039/2312-5330-2024-3-215-230. EDN FUSNLW.</mixed-citation><mixed-citation xml:lang="en">Vysochina M.V., Fokina N.A. Using a process approach in investment and construction activities. Scientific Bulletin: Finance, Banking, Investment. 2024; 3(68):215-230. DOI: 10.29039/2312-5330-2024-3-215-230. EDN FUSNLW. (rus.).</mixed-citation></citation-alternatives></ref><ref id="cit15"><label>15</label><citation-alternatives><mixed-citation xml:lang="ru">Gardini A., Bragadin M.A., Naticchia B., Carbonari A., Corneli A. BPMN 2.0 Modelling for the Management of the Inspection of Execution Processes in Construction // Proceedings of the Creative Construction e-Conference 2020. 2020. Pp. 37–41. DOI: 10.3311/ccc2020-073</mixed-citation><mixed-citation xml:lang="en">Gardini A., Bragadin M.A., Naticchia B., Carbonari A., Corneli A. BPMN 2.0 Modelling for the Management of the Inspection of Execution Processes in Construction. Proceedings of the Creative Construction e-Conference 2020. 2020; 37-41. DOI: 10.3311/ccc2020-073</mixed-citation></citation-alternatives></ref><ref id="cit16"><label>16</label><citation-alternatives><mixed-citation xml:lang="ru">Топчий Д.В., Токарский А.Я., Лавреняк И.В., Газдаров А.А. Распределение основных функций технического заказчика по этапам жизненного цикла строительства объекта // Строительное производство. 2024. № 1. С. 70–75. DOI: 10.54950/26585340_2024_1_70. EDN PMOAXY.</mixed-citation><mixed-citation xml:lang="en">Topchiy D.V., Tokarskiy A.Ya., Lavrenyak I.V., Gazdarov A.A. Distribution of the main functions of the technical customer by stages of the object construction life cycle. Construction Production. 2024; 1:70-75. DOI: 10.54950/26585340_2024_1_70. EDN PMOAXY. (rus.).</mixed-citation></citation-alternatives></ref><ref id="cit17"><label>17</label><citation-alternatives><mixed-citation xml:lang="ru">Топчий Д.В., Лавреняк И.В. Этапы выбора экспертной группы для оценки функций технического заказчика при вводе объекта в эксплуатацию // Строительное производство. 2024. № 4. С. 112–118. DOI: 10.54950/26585340_2024_4_112. EDN RMPWKJ.</mixed-citation><mixed-citation xml:lang="en">Topchiy D.V., Lavrenyak I.V. Stages of selecting an expert group to evaluate the functions of the technical customer when commissioning a facility. Construction Production. 2024; 4:112-118. DOI: 10.54950/26585340_2024_4_112. EDN RMPWKJ. (rus.).</mixed-citation></citation-alternatives></ref><ref id="cit18"><label>18</label><citation-alternatives><mixed-citation xml:lang="ru">Кемайкин Н.К., Павленков М.Н., Маева Л.С. Внедрение процессного подхода в строительной сфере // Экономика: вчера, сегодня, завтра. 2022. Т. 12. № 1–1. С. 53–61. DOI: 10.34670/AR.2022.44.92.007. EDN GXAFDJ.</mixed-citation><mixed-citation xml:lang="en">Kemaikin N.K., Pavlenkov M.N., Maeva L.S. The implementation of the process approach in the con-struction sector. Economics: Yesterday, Today and Tomorrow. 2022; 12(1-1):53-61. DOI: 10.34670/AR.2022.44.92.007. EDN GXAFDJ. (rus.).</mixed-citation></citation-alternatives></ref><ref id="cit19"><label>19</label><citation-alternatives><mixed-citation xml:lang="ru">Кулак О.Д. Совершенствование бизнес-процессов при проектировании и строительстве заводов пищевой промышленности // Вестник науки. 2023. Т. 3. № 6 (63). С. 81–93. EDN YWSCLU.</mixed-citation><mixed-citation xml:lang="en">Kulak O.D. Improving business processes in the design and construction of food processing plants. Science Bulletin. 2023; 3(6):(63):81-93. EDN YWSCLU. (rus.).</mixed-citation></citation-alternatives></ref><ref id="cit20"><label>20</label><citation-alternatives><mixed-citation xml:lang="ru">Ложкин Н.Д. Актуальные вопросы реинжиниринга бизнес-процессов // Colloquium-Journal. 2020. № 9–1 (61). С. 9–12. EDN MDGIFA.</mixed-citation><mixed-citation xml:lang="en">Lozhkin N.D. Topical issues of re-engineering business processes. Colloquium-Journal. 2020; 9-1(61):9-12. EDN MDGIFA. (rus.).</mixed-citation></citation-alternatives></ref><ref id="cit21"><label>21</label><citation-alternatives><mixed-citation xml:lang="ru">Сборщиков С.Б., Маслова Л.А. Реинжиниринг объектов капитального строительства и реинжиниринг технологических процессов // Вестник МГСУ. 2019. Т. 14. № 10. С. 1321–1330. DOI: 10.22227/1997-0935.2019.10.1321-1330. EDN PVOLNK.</mixed-citation><mixed-citation xml:lang="en">Sborshikov S.B., Maslova L.A. Reengineering of capital construction objects and reengineering of technological processes. Vestnik MGSU [Monthly Journal on Construction and Architecture]. 2019; 14(10):1321-1330. DOI: 10.22227/1997-0935.2019.10.1321-1330. EDN PVOLNK. (rus.).</mixed-citation></citation-alternatives></ref><ref id="cit22"><label>22</label><citation-alternatives><mixed-citation xml:lang="ru">Новикова А.Ю., Кан Е.Н. Автоматизация процессов обновления данных BIM-моделей объектов капитального строительства // Экономика. Право. Инновации. 2024. № 2. С. 72–80. DOI: 10.17586/2713-1874-2024-2-72-80. EDN SYGOWC.</mixed-citation><mixed-citation xml:lang="en">Novikova A.Yu., Kan E.N. Automation of BIM data updating processes-models of capital construction objects. Economics. Law. Innovations. 2024; 2:72-80. DOI: 10.17586/2713-1874-2024-2-72-80. EDN SYGOWC. (rus.).</mixed-citation></citation-alternatives></ref><ref id="cit23"><label>23</label><citation-alternatives><mixed-citation xml:lang="ru">Рзун И.Г., Радин А.Ю., Балухин В.Ю. BIM-технологии как объектно-ориентированная модель строительного объекта // Вестник Академии знаний. 2024. № 2 (61). С. 357–360. EDN RVJRQL.</mixed-citation><mixed-citation xml:lang="en">Rzun I.G., Radin A.Yu., Balukhin V.Yu. BIM technologies as an object-oriented model of a construction object. Bulletin of the Academy of Knowledge. 2024; 2(61):357-360. EDN RVJRQL. (rus.).</mixed-citation></citation-alternatives></ref><ref id="cit24"><label>24</label><citation-alternatives><mixed-citation xml:lang="ru">Копылов А.Д., Королев А.В., Батищев А.В. Цифровизация процессов управления в строительстве // Естественно-гуманитарные исследования. 2023. № 2 (46). С. 370–375. EDN YJEKYJ.</mixed-citation><mixed-citation xml:lang="en">Kopylov A.D., Korolev A.V., Batishchev A.V. Digitalization of management processes in construction. Natural and Humanitarian Studies. 2023; 2(46):370-375. EDN YJEKYJ. (rus.).</mixed-citation></citation-alternatives></ref><ref id="cit25"><label>25</label><citation-alternatives><mixed-citation xml:lang="ru">Топчий Д.В., Лавреняк И.В. Организационные предложения для повышения эффективности процесса выполнения функций технического заказчика при вводе объекта в эксплуатацию // Строительное производство. 2025. № 3. С. 27–31. DOI: 10.54950/26585340_2025_3_27. EDN XPBHGG.</mixed-citation><mixed-citation xml:lang="en">Topchiy D.V., Lavrenyak I.V. Organizational proposals to improve the efficiency of the process of performing the functions of a technical customer during the commissioning of a facility. Construction Production. 2025; 3:27-31. DOI: 10.54950/26585340_2025_3_27. EDN XPBHGG. (rus.).</mixed-citation></citation-alternatives></ref><ref id="cit26"><label>26</label><citation-alternatives><mixed-citation xml:lang="ru">Al-Siah H., Fioravanti A. BIM and BPMN 2.0 integration for interoperability challenge in construction industry // Technological Imagination in the Green and Digital Transition. 2023. Pp. 227–235. DOI: 10.1007/978-3-031-29515-7_21</mixed-citation><mixed-citation xml:lang="en">Al-Siah H., Fioravanti A. BIM and BPMN 2.0 integration for interoperability challenge in construction industry. Technological Imagination in the Green and Digital Transition. 2023; 227-235. DOI: 10.1007/978-3-031-29515-7_21</mixed-citation></citation-alternatives></ref><ref id="cit27"><label>27</label><citation-alternatives><mixed-citation xml:lang="ru">Cao S., Sun H., Tong Z. BPMN-Based Building Project Lifecycle Analysis with a Core of BIM // CAAD Futures 2025 — Catalytic Interfaces Conference Proceedings. Vol. I. Hong Kong : The University of Hong Kong, 2025. Pp. 375–388.</mixed-citation><mixed-citation xml:lang="en">Cao S., Sun H., Tong Z. BPMN-Based Building Project Lifecycle Analysis with a Core of BIM. CAAD Futures 2025 — Catalytic Interfaces Conference Proceedings. Vol.I. Hong Kong, The University of Hong Kong, 2025; 375-388.</mixed-citation></citation-alternatives></ref></ref-list><fn-group><fn fn-type="conflict"><p>The authors declare that there are no conflicts of interest present.</p></fn></fn-group></back></article>
