Modelling of business processes of engineering companies at the stages of the life cycle of an investment and construction project
https://doi.org/10.22227/1997-0935.2024.11.1789-1796
Abstract
Introduction. The engineering company ensures the interaction of all participants of the investment and construction project throughout its life cycle and implements a variety of business processes. Due to the fact that an engineering company coordinates the work of design and contracting organizations, suppliers of material and technical resources, the effectiveness of its organizational structure largely determines the efficiency of all participants in an investment and construction project.
Materials and methods. The paper defines business processes and organizational structure and shows that for modelling business processes under various organizational structures, the most rational solution is modelling based on queuing networks. As a result, a simulation model of a queuing network was developed for an abstract business process and a simplified organizational structure. The GPSS simulation language was used for software implementation.
Results. As a result of the modelling, it is shown that by varying the time indicators of the implementation of business processes and the times of performing various business functions, as well as the quantitative composition of performers in the divisions of an engineering company, it is possible to obtain stable estimates of the effectiveness of its production activities. The main estimates include the average implementation time of the main business processes and the average queue of queries for the implementation of the relevant business processes. Based on the obtained values of these indicators, the management will be able to make more reasonable decisions about the staffing of the engineering company and the transformation of its organizational structure.
Conclusions. Modelling is the main mechanism for solving forecasting and optimization problems. Based on the simulation results, it is possible to make an informed decision about the number of employees needed to support a certain group of business processes.
About the Authors
V. I. PaskannyRussian Federation
Vladimir I. Paskanny —– senior lecturer of the Department of Technologies and Organization of Construction Production
26 Yaroslavskoe shosse, Moscow, 129337
A. A. Lapidus
Russian Federation
Azariy A. Lapidus — Doctor of Technical Sciences, Professor, Head of the Department of Technologies and Organization of Construction Production
26 Yaroslavskoe shosse, Moscow, 129337
Scopus: 57192378750, ResearcherID: B-4104-2016
References
1. Dijkman R.M., Adan I., Peters S. Advanced queueing models for quantitative business process analysis. 2018 44th Euromicro Conference on Software Engineering and Advanced Applications (SEAA). 2018; 260-267. DOI: 10.1109/seaa.2018.00050
2. Dumas M., La Rosa M., Mendling J., Reijers H.A. Fundamentals of Business Process Management. Second Ed. Springer, 2018. DOI: 10.1007/978-3-662-56509-4
3. Grefen P., Brouns N., Ludwig H., Serral E. Co-location specification for IoT-aware collaborative business processes. Lecture Notes in Business Information Processing. 2019; 120-132. DOI: 10.1007/978-3-030-21297-1_11
4. Abrams R. 100 % business plan: Strategy and tactics of effective business. Moscow, Alpina Publisher Publ., 2019; 496. (rus.).
5. Osterwalder A., Yves Pigneur. Building business models. The Strategist and Innovator’s Handbook. Moscow, Alpina Publisher, 2019; 288. (rus.).
6. Barinov V.A. Organizational design. Moscow, INFRA-M Publ., 2019; 384. (rus.).
7. Daft R., Murphy J., Wilmott H. Organizational theory and design. St. Petersburg, Piter Publ., 2013; 640. (rus.).
8. Silka D.N., Ermolaev E.E., Durov R.A., Kopelchuk S.Yu. Engineering of industrial investment and construction projects. Moscow, Stroyinformizdat Publ., 2014; 256. (rus.).
9. Michelfelder D.P., Doorn N. The Routledge Handbook of the Philosophy of Engineering. Routledge, 2020. DOI: 10.4324/9781315276502
10. Shinkareva G.N. Model engineering scheme of the organization of construction in the future the life cycle of objects. Vestnik MGSU [Proceedings of Moscow State University of Civil Engineering]. 2018; 13(9):1090-1105. DOI: 10.22227/1997-0935.2018.9.1090-1105. EDN VKFFPI. (rus.).
11. Cagno E., Neri A., Negri M., Bassani C.A., Lampertico T. The role of digital technologies in operationalizing the circular economy transition: a systematic literature review. Applied Sciences. 2021; 11(8):3328. DOI: 10.3390/app11083328
12. Orlov A.K., Belyakova A.P. Fundamentals of business engineering in the investment and construction sector. Moscow, Publishing house MGSU, 2016; 70. EDN YSFWWX. (rus.).
13. Gassman O., Frankenberger K., Schick M. Business models: 55 best templates. Moscow, Alpina Publisher, 2019; 432. (rus.).
14. Munsamy M., Telukdarie A., Fresner J. Business process centric energy modelling. Business Process Management Journal. 2019; 25(7):1867-1890. DOI: 10.1108/BPMJ-08-2018-0217
15. Lapidus A.A., Muria V.A. Comprehensive indicator of quality of organizational-technological decisions in the construction of construction elements of reinforced concrete buildings. Construction Production. 2020; 2:3-9. DOI: 10.54950/26585340_2020_2_3. EDN QMABHQ. (rus.).
16. Lapidus A.A. Tools of production scheduling — an integral efficiency potential of organizational, technological and management solutions of a construction object. Vestnik MGSU [Proceedings of Moscow State University of Civil Engineering]. 2015; 1:97-102. (rus.).
17. Awan U., Sroufe R., Shahbaz M. Industry 4.0 and the circular economy : a literature review and recommendations for future research. Business Strategy and the Environment. 2021; 30(4):2038-2060. DOI: 10.1002/bse.2731
18. Martin N., Depaire B., Caris A. The use of process mining in business process simulation model construction. Business & Information Systems Engineering. 2016; 58(1):73-87. DOI: 10.1007/s12599-015-0410-4
19. Rosado-Serrano A., Paul J., Dikova D. International franchising : а literature review and research agenda. Journal of Business Research. 2018; 85:238-257. DOI: 10.1016/j.jbusres.2017.12.049
20. Peters S., Dijkman R., Grefen P. Quantitative effects of advanced resource constructs in business process simulation. 2018 IEEE 22nd International Enterprise Distributed Object Computing Conference (EDOC). 2018; 115-122. DOI: 10.1109/edoc.2018.00024
21. Grefen P., Brouns N., Ludwig H., Serral E. Co-location specification for IoT-aware collaborative business processes. Lecture Notes in Business Information Processing. 2019; 120-132. DOI: 10.1007/978-3-030-21297-1_11
Review
For citations:
Paskanny V.I., Lapidus A.A. Modelling of business processes of engineering companies at the stages of the life cycle of an investment and construction project. Vestnik MGSU. 2024;19(11):1789-1796. (In Russ.) https://doi.org/10.22227/1997-0935.2024.11.1789-1796