Efficiency of tower cranes in the construction of low-rise buildings

https://doi.org/10.22227/1997-0935.2025.2.306-316

Abstract

Introduction. Lifting mechanisms are important in modern construction production, providing an efficient and safe way to move and lift materials and building structures. Stations, travel routes, and service areas for lifting mechanisms are reflected in construction master plans. Site design begins with the installation of lifting equipment. In common practice, when comparing crane options, technical and economic indicators associated with the purchase, rental and operation of the mechanism are taken into account, without taking into account how a particular mechanization option affects the location of construction infrastructure and technical and economic indicators of the construction plan. Due to the increasing space constraint, it is necessary to revise the system of technical and economic parameters for construction plans assessing.

Materials and methods. The normative-legal base regulating the construction site organization, lifting mechanisms placement and safe construction production is studied. Design and working documentation is analyzed: construction organization projects, projects of works production, projects of works production with application of lifting facilities. The variant technological design of construction plans was carried out and the influence of the accepted lifting mechanism on the compactness of the construction site at erection of low-rise objects was estimated.

Results. The obtained results expand the idea about the choice of lifting mechanisms for the erection of low-rise objects. It is suggested to supplement the system of technical and economic indicators of evaluation of the efficiency of the adopted technological solutions with the presented evaluation indicators, which take into account the location of hoisting cranes on the construction site and affect the compactness of the construction site.

Conclusions. The design of construction master plans should be varied and performed with the use of various lifting equipment. The effectiveness of choosing lifting machinery should be determined by a system of parameters along with the main technical and economic parameters to assess construction plans.

About the Authors

O. V. Ashihmin
Industrial University of Tyumen (IUT)
Russian Federation

Oleg V. Ashihmin — Candidate of Technical Sciences, Associate Professor, Head of the Department of Construction Production

38 Volodarskogo st., Tyumen, 625000

RSCI AuthorID: 747173, Scopus: 57192667381



A. P. Shestakova
Industrial University of Tyumen (IUT)
Russian Federation

Alena P. Shestakova — Candidate of Economic Sciences, Associate Professor, Associate Professor of the Department of Construction Production

38 Volodarskogo st., Tyumen, 625000

RSCI AuthorID: 756676, Scopus: 57205079167, ResearcherID: HKV-4731-2023



References

1. Alimpiev K.O. Possibility of automation of a construction master. Days of Student Science : collection of reports of the scientific and technical conference on the results of research work of students of the Institute of Digital Technologies and Modeling in Construction National Research University Moscow State University of Civil Engineering. 2022; 356-360. EDN MVDFQA. (rus.).

2. Yakimov I.A. Research of methods for increasing the efficiency of organizational and technological solutions in Construction Management Plan and Work Design based on the possibility of automation of construction master. Science and Youth : Materials of the XIX All-Russian Scientific and Technical Conference of Students, Postgraduate Students and Young Scientists. 2022; 167-169. EDN MYWNFW. (rus.).

3. Bansal V.K. Integrated CAD and GIS–Based Framework to Support Construction Planning: Case Study. Journal of Architectural Engineering. 2017; 23(3). DOI: 10.1061/(ASCE)AE.1943-5568.0000262

4. RazaviAlavi S., AbouRizk S. Site layout and construction plan optimization using an integrated genetic algorithm simulation framework. Journal of Computing in Civil Engineering. 2017; 31(4). DOI: 10.1061/(ASCE)CP.1943-5487.0000653

5. Wang X. Using augmented reality to plan virtual construction worksite. International Journal of Advanced Robotic Systems. 2007; 4(4). DOI: 10.5772/5677

6. Ryazantseva N.V. Aspects of the organization of construction in modern conditions of urban sealing development. Construction Production. 2023; 3:28-34. DOI: 10.54950/26585340_2023_3_28. EDN HSGMNH. (rus.).

7. Subbotina E.K., Lukina L.A., Kononova E.S., Gromov V.S., Bopun-ool A.A., Mutovina A.S. et al. Organization of construction work in cramped conditions. Economics and Entrepreneurship. 2019; 11(112):947-950. EDN YNZMLK. (rus.).

8. Aleksanin A. Possible risks in construction of the facility in cramped conditions. MATEC Web of Conferences. 2018; 251:06021. DOI: 10.1051/matecconf/201825106021

9. Gaidukov P., Pugach E. Prospects for the development of stay in plase formwork for low-rise buildings in cramped conditions. E3S Web of Conferences. 2021; 258:09030. DOI: 10.1051/e3sconf/202125809030

10. Sokolov N.S., Viktorova S.S., Maguskin V.V., Malyanova L.I. Common mistakes made under facility construction in cramped conditions. Journal of Physics: Conference Series. 2021; 1928(1):012022. DOI: 10.1088/1742-6596/1928/1/012022

11. Lapidus A.A., Demidov L.P. Investigation of the Factors Influencing the Potential Indicator of a Construction Site. Vestnik MGSU [Proceedings of Moscow State University of Civil Engineering]. 2014; 4:160-166. EDN SATGXN. (rus.).

12. Lapidus A.A., Oleynik P.P. Justification of the process of choosing organizational and technological solutions. Industrial and Civil Engineering. 2024; 4:70-74. DOI: 10.33622/0869-7019.2024.04.70-74. EDN IHPPPR. (rus.).

13. Lapidus A.A., Katasonova M. Parameters of the crane selection during the designing of the construction master plans. Construction Production. 2019; 1:56-61. DOI: 10.54950/26585340_2019_1_56. EDN CJYXSJ. (rus.).

14. Sohn H.W., Hong W.K., Lee D., Lim C., Wang X., Kim S. Optimum Tower Crane Selection and Supporting Design Management. International Journal of Advanced Robotic Systems. 2014; 11(8). DOI: 10.5772/58438

15. Zhang Y., Chen K. Digital technologies for enhancing crane safety in construction: a combined quantitative and qualitative analysis. Journal of Civil Engineering and Management. 2023; 29(7):(2023):604-620. DOI: 10.3846/jcem.2023.19574

16. Zhadanovsky B., Bazanov V. Organizational and technological solutions for performing works using specialty equipment. E3S Web of Conferences. 2019; 97:06002. DOI: 10.1051/e3sconf/20199706002

17. Petrosyan R.S. Formation of an organisational and technological mechanism to improve the manufacturability of works in total building renovation. Construction: Science and Education. 2023; 13(1):84-97. DOI: 10.22227/2305-5502.2023.1.6. EDN UQDSGZ. (rus.).

18. Gusakova N., Gusakov A., Prokhorova Yu., Karakozova I. Development of organizational and economic mechanism of intensification of low-rise housing construction in remote areas with special climatic conditions. E3S Web of Conferences. 2022; 363:02035. DOI: 10.1051/e3sconf/202236302035

19. Motyčka V., Gašparík J., Přibyl O., Štěrba M., Hořínková D., Kantová R. Effective use of tower cranes over time in the selected construction process. Buildings. 2022; 12(4):436. DOI: 10.3390/buildings12040436

20. Oleynik P.P. Concept of increasing the level of projects of work production. Industrial and Civil Engineering. 2020; 2:59-63. DOI: 10.33622/0869-7019.2020.02.59-63. EDN VGKUQF. (rus.).


Review

For citations:


Ashihmin O.V., Shestakova A.P. Efficiency of tower cranes in the construction of low-rise buildings. Vestnik MGSU. 2025;20(2):306-316. (In Russ.) https://doi.org/10.22227/1997-0935.2025.2.306-316

Views: 120


Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 License.


ISSN 1997-0935 (Print)
ISSN 2304-6600 (Online)